How an office building leverages their electric cooling system to curtail demand during a grid peak event.

Use the arrows to learn more
How an office building leverages their electric cooling system to curtail demand during a grid peak event.
Before the event
Normal Operations
In between flexible load management events, the building is cooled to its normal set point of 73ºF.
Before the peak
Storing Energy
For the 3 hours leading up to the event, the building’s set point is decreased to 72ºF.
This decreases the temperature of the room, storing thermal energy.
The building’s demand temporarily increases above its baseline to store this energy.
During the peak
Returning Energy to the Grid
During the event, the cooling set point increases to 78ºF.
The pre-cooling allows the building to coast on the stored energy, maintaining a comfortable temperature range.
This reduces electrical demand during the event, returning the stored energy to the grid.
After the event
Cost Savings
The cooling set point returns to its baseline of 73ºF.
After a short period of intense cooling, the room cools back to the set point and the cooling system returns to normal operations.
The demand returns back to baseline, and the customer and the utility save money and resources by lowering the customer’s demand during the peak event.
2013
Morgan Casella and Andy Klaski found Dynamic Organics in 2013 in Putney, VT.
The business begins with small-scale anaerobic digestion and renewable energy system design.
2015-2017
Realizing the potential of flexible load management as part of the transition to renewables, DO Outlines VT Smart Grid Architecture with Green Mountain Power
2018
Dynamic Organics develops controls to transform the Brattleboro Retreat’s ice making equipment into an energy storage system, reducing its peak demand by more than 115 kW, saving an estimated $13,500 just by shifting the timing of their energy use to off-peak.
Learn more about the “Ice Battery” at the Brattleboro Retreat
2018-2019
The FLM 1.0 Pilot Begins with 10 customers.
2021
The FLM 2.0 Pilot Begins with 30+ customers, including cold chain storage, residential buildings, municipal utilities, and industrial plants.
2023
FLM 3.0 Dynamic Rate is designed.
2024
The FLM 3.0 Pilot Begins.
The Ski Dashboard launches, allowing mountains to participate in demand curtailments without the danger and inefficiency of last minute snowmaking shutdowns.
2023 - 2026
2023: VEC FLM Program goes live with full tariffed rider offering approved by PUC.
2024: BED Building GIANTS Program GRIP Round I awarded
2026: Building GIANTS Program commences with with dynamic FLM rider approved by PUC.
2026
50+ New FLM Sites are Added.
2027
GMP is preparing to introduce a full FLM tariff option.




We offer software platforms and consulting services for flexible load management.